KOMUNITAS RTRW NET RT 02 | |||
Rincian Anggaran RTRW NET Grup 2 | |||
Jumlah member grup 2 : | 7 orang | @Rp.250.000 | |
Total Iuran Grup 2 | Rp1.750.000 | ||
No | Nama Barang | Jumlah | Harga |
1 | Kabel UTP-AMP | 1roll | Rp875.000 |
2 | HUB TP-LINK | 3 unit | Rp380.000 |
3 | Internet line 2 | 1 unit | Rp140.000 |
4 | Konektor RJ45 | 1box | Rp45.000 |
5 | Socket 2 Hole | 3 unit | Rp22.500 |
6 | Kabel Listrik | 5 meter | Rp25.000 |
7 | Steker | 2 pcs | Rp6.000 |
8 | siku2 | 3 set | Rp20.000 |
9 | Tplink .103 | 1 pc | Rp5.000 |
10 | transport | 1 pc | Rp15.000 |
11 | Upah Pak Anda | 1 unit | Rp50.000 |
12 | Kabel telpon | 10 meter | Rp10.000 |
13 | adsl splitter | 1 unit | Rp29.000 |
14 | Klem Kabel | 4 bks | Rp10.000 |
Total Pengeluaran | Rp1.632.500 | ||
Sisa Saldo | Rp117.500 | ||
Koordinator Jaringan Sementara | Mengetahui | ||
Ketua RT.02 | |||
Atik Nuryadin | Murphyto | ||
Laporan Instalasi Grup 2
Langganan:
Postingan (Atom)